North Central Province Canal Project (NCPCP)

Moragahakanda Downstream

The NCPCP comprises two components. The first component is the construction of the Kalu Ganga-Moragahakanda Transfer Canal (including two tunnels) that will transfer water between the Kalu Ganga and Moragahakanda reservoirs. The second component is the construction of the Upper Elahera Canal that connects the Moragahakanda reservoir to the existing reservoirs Huruluwewa, Manankattiya, Eruwewa and Mahakanadarawa (including in total 28 km of tunnels). These reservoirs feed existing irrigation and water supply schemes.

The office of the NCPC Project Implementation Unit (PIU) is located near Dambulla. MWSIP’s estimate of the cost of the NCPCP is LKR 65,000 million.

Project Details

2021 NCPCP - උතුරු මැද පළාත් මහ ඇළ -1 කොටස

Click Here For See Project Progress

Project Progress

NCPCP status 

  • Project Implementation Unit (PIU) is functioning at Madatugama
  • Office for Program Management Design & Supervision Consultant in place at Elahera
  • All required resources for PIU and PMDSC are available
  • Prepared the  Resettlement Implementation Plan (RIP)
  • Identified Project Affected Persons (PAPs)/families
  • Formed the Graveness Redress Committees(GRC) to hear the PAPs’ graveness
  • Resettlement and land acquisition process is progressing
  • Prepared the communication work plan
  • Raised the awareness among PAPs on possible impact
  • Made aware the main stakeholders of the project
  • Leaflet on the project was published and being  disseminated
  • Excellency President launched the project with inauguration on 11th, January,2017
Environmental Impact Assessment Report (EIAR)
  • Completed in June 2015
  • Conditional Approval granted by CEA / DWC
  • Approval granted by ADB
Updated Environmental Management Plan(EMP)
  • Updated EMP on UEC-ICB 1 contract package submitted to the CEA & ADB for their approval
Formation of Environmental Monitoring Committee (EMC)
  • In progress
Environmental Officer (EO) for Project management Unit (PIU) to monitor the EMP implementation
  • Appointed in the Project management Unit (PIU), Dambulla
Contractor’s aspects for Environmental safeguard (UEC-ICB 1)
  • Appointed EO by contractor to the construction site
  • CEMP preparation – In progress
  • Awareness for contractor on safeguard aspects – in progress
Other Environmental safeguard practices
  • Tree enumeration survey along the UEC-ICB 1 contract – Completed & approval granted by DWC
  • Baseline survey for Environmental parameters (Air Quality/ Noise, Vibration, Water Quality/ Sediment) – In progress
  • IUCN baseline studies along UEC – ICB 1 trace completed

GRM

Please enable JavaScript in your browser to complete this form.
Reach Us

Mahaweli Water Security Investment Program,
Program Management Unit,
No. 493 1/1, T.B. Jayah Mawatha,
Colombo 10, Sri Lanka.

PMDSC – Program Management Design &
Supervision Consultant,
No. 493 1/1, T.B. Jayah Mawatha,
Colombo 10.

+94 11 2 675 063
michael.chegwin@tractebel.engie.com

Copyright © 2023 Mahaweli Water Security Investment Program.All Rights Reserved.
Design & Developed by Ysoft
Reach Us

Mahaweli Water Security Investment Program,
Program Management Unit,
No. 493 1/1, T.B. Jayah Mawatha,
Colombo 10, Sri Lanka.

PMDSC – Program Management Design &
Supervision Consultant,
No. 493 1/1, T.B. Jayah Mawatha,
Colombo 10.

+94 11 2 675 063
michael.chegwin@tractebel.engie.com

Copyright © 2023 Mahaweli Water Security Investment Program.All Rights Reserved.
Design & Developed by Ysoft

Subscribe for the updates!